READINESS DOSSIER / WORKSHEET

Build the Production-Readiness Dossier.

An unclassified readiness dossier organizes the production decision without requesting program names, technical files, controlled requirements, or sensitive identifiers. It makes assumptions and evidence gaps visible early.

What does the dossier establish?

The dossier creates a bounded, unclassified view of the obligation, proposed production basis, control categories, information boundary, evidence needs, and next decision. It is a screening and planning tool, not a capability certification or production commitment.

UNCLASSIFIED WORKSHEETPROGRAM READINESS / REV 01

Select the categories that already have an owner and a current evidence source. The score is a conversation aid, not a compliance or readiness determination.

0 of 10 categories have an identified owner and evidence source.

Ten questions in an unclassified program-readiness review

  1. What program decision must be made next?
  2. Which facts are confirmed and which are capture or planning assumptions?
  3. What product configuration is intended for the decision?
  4. Which source restrictions apply, and what is their governing basis?
  5. What evidence connects material and work to an accepted unit?
  6. Which inspections and tests establish acceptance?
  7. Who may approve deviations, changes, and release?
  8. What information categories are anticipated?
  9. What legal, facility, account, system, identity, and access conditions apply?
  10. Which gaps prevent a written production commitment?

How should the worksheet be interpreted?

A checked category means only that an owner and evidence source have been identified. It does not mean the evidence is sufficient, current, approved, or applicable to the proposed scope. An unchecked category is not automatic disqualification. It is a signal that the next review must define ownership, source material, and decision authority.

The dossier should remain at the category level until an approved exchange path exists. Program names, solicitation identifiers, platform identifiers, technical drawings, controlled requirements, credentials, and customer-restricted information do not belong in this public tool.

What comes out of the formal review?

A formal review should produce a fit decision, an information-gap list, proposed handling conditions, a requirements-to-evidence structure, and an explicit next gate. It should not produce an unsupported statement of compliance, schedule, capacity, price, domestic content, or facility fit.

Use the dossier openly.